Kawasaki Terminal
– South Area

Kawasaki Terminal – South Area

On September 1, 2023, we began a new chapter as the Kawasaki Terminal – South Area of CTT, transitioning from Tokyo Yuso Co., Ltd.
As a public tank terminal, we operate one of the largest facilities in the metropolitan area, equipped with extensive berths, tanks, and warehouses.

Facility Overview

Location
4-1 Chidoricho, Kawasaki-ku, Kawasaki-shi, Kanagawa 210-0865, Japan Google Map
Tel : +81-44-276-3801 / Fax : +81-44-276-3803
Business Hours & Closed Days
7:30 – 16:00
Saturdays, Sundays, public holidays and the year-end/New Year holidays (December 29 to January 4)
Site Area
72,366.989㎡
Berths
(1) 60,000 DWT Length: 208.0 m Draft: 10.9 m
(2) 2,000 DWT Length: 73.7 m Draft: 4.9 m
(3) 300 DWT Length: 34.5 m Draft: 2.4 m
Tanks
Up to 500 KL 64 tanks Total capacity: 23,633 KL
(including non-hazardous and designated flammable material tanks)
501–1,000 KL 22 tanks Total capacity: 18,205 KL
(including designated flammable material tanks)
1,001–3,000 KL 2 tanks Total capacity: 5,040 KL
3,001–5,000 KL 2 tanks Total capacity: 7,027 KL
Over 5,001 KL 1 tank Total capacity: 8,700 KL
Tank Capacity (per tank)
20KL – 8,700KL
Hazardous Materials Warehouses
Hazardous Materials Automated High-Rise Warehouse : 1 building Floor area: 999 m² (4,424 racks)
Hazardous Materials Warehouses : 6 buildings Floor area: 4,500 m²
General Cargo Warehouse : 1 building Floor area: 979 m² (1,336 racks)
Multi-Workstation
(Drum and Packaging Conversion Facility)
Drum ⇔ Small cans
Drum ⇔ Tank truck loading
Filling and decanting operations
Heating Facilities
Tank Truck Loading Facilities
16 lanes (12 for hazardous materials, 4 for designated flammable materials and general cargo)
Drum Filling Facilities
Filling Machines : 10
Can Filling Machines : 2
Truck Scales
Maximum capacity: 50 tons
Length : 15 m 2 units (Entrance / Exit)
Steam Supply Capacity
0.3 MPa
Boilers
Maximum capacity: 2 tons/hour 3 units
Nitrogen Gas Supply Tank
Supply capacity: 150–750 m³/hour
Laboratory
SHIN NIHON KENTEI KYOKAI (partner company)

ISO9001/ISO14001/ISO45001

Access

セントラル・タンクターミナル川崎事業所 南エリア

4-1 Chidoricho, Kawasaki-ku, Kawasaki-shi, Kanagawa 210-0865, Japan
Tel : +81-44-276-3801 / Fax : +81-44-276-3803

  • By Train and Bus
    From the East Exit Bus Terminal at Kawasaki Station (JR Kawasaki Station / Keikyu Kawasaki Station), take a Kawasaki City Bus for approximately 20 minutes and get off at "JERA Kawasaki Thermal Power Station-mae."
    The site is a 1-minute walk from the bus stop.
  • By Car
    Shuto Expressway Bayshore Route
    ⇒ 5 minutes from the Higashi-Ogishima Exit
    Shuto Expressway Kanagawa Route 1 (Yokohane Route)
    ⇒ Approximately 20 minutes from the Asada Exit (from Yokohama direction)
    ⇒ Approximately 15 minutes from the Daishi Exit (from central Tokyo direction)